Quality. Integrity. Experience...

Quality. Integrity. Experience. Innovation. These are the intrinsic characteristics you expect when you hire a contractor to complete a complicated commercial design/build project or commercial installation. Howard Kane Plumbing Company employs each of them to perpetuate the kind of high-quality product, standards and professional workmanship our company has been known to consistently produce.

Alternative text

Quality

From design to delivery, we help set the standard for the industry by meeting and exceeding expectations. We have more than a half-century of solid experience and reliable performance and we stand behind our work. Our goal is to provide every client with a commitment to quality and excellence by refining processes to improve our products and relationships. We achieve high standards through quality craftsmanship, materials and professional service. Our attitude is quality without compromise.

Alternative text

Integrity

Over the years, our company’s principal focus has been to foster client relationships derived from honesty and integrity. This philosophy, in addition to the attainment of a highly skilled and technically qualified team to serve client needs, has earned Howard Kane Plumbing Company a reputation of dedication to work and excellence in product. Our vast experience with a diverse range of methods and materials, and our understanding of building requirements, allows us to lead performance goals throughout our industry.

Alternative text

Experience

With over fifty years in the business, Howard Kane Plumbing Company had developed a reputation for unrivaled customer service and the highest quality of work in the region.  Our project experience covers the scope from office buildings and complexes, warehouses and distribution centers, to food processing and medical gas systems. The knowledge and longevity of our project managers and superintendents are unsurpassed in the industry. Our expertise and our resources allow us to practice strict quality control standards and meet rigorous deadlines which reflect our high quality and experience.

Alternative text

Innovation

We specialize in a “team” approach to project delivery because it consistently offers the owner and contractor the most value for their investment. Partnering with architects, developers and owners, our projects are constructed to maximize cost-efficiency, versatility and endurance through the use of a method called value-engineering. The value-engineering analysis compares the initial cost versus long term return on investment and often results in design changes and/or selection of critical materials and methods of construction. As a direct team associate, you are kept informed as to the available options and receive objective recommendations. Not only are communications better from the inception of the project but this process offers other advantages down the line in terms of schedule and quality control.

Alternative text
Quality Integrity Experience Innovation

Projects

Gateway Logistics Center 1-5

General Contractor: FA Peinado

Size: 1.400,000 ft2

Location: DFW Airport

Design/Build encompassing 5 distribution warehouses ranging in size from 200,00 sf - 380,000 sf. This project is part of DFW Airports Passport Park Development along S.H. 183.

Rent the Runway

General Contractor: Bob Moore

Size: 300,000 ft2

Location: Arlington, TX

Design/Build distribution center for Rent the Runway. Centrally located within the Dallas/Fort Worth area to accommodate the company's rapid growth and allowing for faster delivery to their customers.

North Texas Food Bank

General Contractor: Hillwood Construction

Size: 220,000 ft2

Location: Plano, TX

Design/Build distribution warehouse for the North Texas Food Bank known as the Perot Campus located in Plano, TX on Mapleshade Ln. near the George Bush Turnpike.

Lakeside Ranch

General Contractor: Duke Realty

Size: 635,000 ft2

Location: Flower Mound, TX

Design/Build distribution center whose primary tenant will be PPG. This location will be the largest distribution center of architectual paints and coating in the US and Canada for PPG.

Shippers 1&2

General Contractor: Duke Realty

Size: 1,146,000

Location: Hutchins, TX

Build-to Suit corporate headquarters as well as grocery warehousing and distribution space for Shippers Warehouse, Inc.

Logistics Center II – Amazon

General Contractor: Hillwood Construction

Size: 1,000,000 ft2

Location: DFW Airport

Plan/Spec fulfillment center for Amazon. The second fulfillment center for Amazon located at DFW Airport will distribute larger non-sortable items such as TV's and furniture.

Logistics Center I – Amazon

General Contractor: Hillwood Construction

Size: 1,000,000 ft2

Location: DFW Airport

Design/Build Shell, Plan/Spec Finish-Out fulfillment center for Amazon. Providing the ability to transport packages with ease.

Jupiter Business Park

General Contractor: Bob Moore

Size: 800,000 ft2

Location: Garland, TX

Design/Build project encompassing 2 distribution warehouses. Redeveloping industrial space along Jupiter Road.

Wayfair

General Contractor: Duke Realty

Size: 874,566 ft2

Location: Lancaster, TX

Build-to-suit distribution warehouse for Wayfair.com including 14,000 ft2 of office space. Located on I35 E. for easily accessible distribution routes.

DiMare Fresh

General Contractor: Spring Valley Construction

Size: 119000 ft2

Location: Fort Worth, TX

Design/Build of a fresh fruit and vegetable distribution center and central office.

FedEx Freight

General Contractor: Hillwood Construction Service

Size: 132678 ft2

Location: Lewisville, TX

Plan/Spec project of freight distribution including guard house and fueling station for FedEx Corporation.

Tohatsu

General Contractor: Duke Realty

Size: 108000 ft2

Location: Coppell, TX

Design/Build of a distribution and testing facility for Tohatsu Motors. Includes 10800 ft2 of office/warehouse with 7500 ft2 designated as office space.

Walmart

General Contractor: Hillwood Construction Service

Size: 1002620

Location: Fort Worth, TX

Design/Build distribution center for Walmart Corporation. Smooth panel tilt-wall construction with heavy landscaping and irrigation.

TTI Distribution

General Contractor: Bob Moore Construction

Size: 610000 ft2

Location: Fort Worth, TX

Design/Build distribution center of electrical components for Berkshire Hathaway.

Point South

General Contractor: Commerce Construction

Size: 249640 ft2

Location: Hutchins, TX

Build to suit distribution warehouse for Majestic Realty. Located on I-45 next to FedEx Ground's shipping facility

Southport Logistics

General Contractor: Cadence McShane

Size: 1075260 ft2

Location: Wilmer, TX

Design/Build encompassing two distribution Warehouses for PLR. A key gateway to the international containerized cargo flow.

Logistics 3,4 & 5

General Contractor: Hillwood Construction Services

Size: 391898 ft2

Location: DFW Airport

Design/Build project encompassing three buildings for Perot Development Company. State of the art regional distribution center located at DFW Airport.

Fresenius Medical Care Distribution Center

General Contractor: Logan Creek Construction Company

Size: 500,000 ft2

Location: DFW Airport

This design/Build 500,000 SF state-of-the-art facility is a regional distribution center for Fresenius Medical Care North America (FMCNA), the world's largest, integrated provider of products and services for individuals with chronic kidney failure.

Chicken Express Distribution Center

General Contractor: Bob Moore Construction

Size: 89,581 ft2

Location: Burleson, TX

The design/build state-of-the-art distribution center and corporate headquarters office includes 89,581 SF cold storage distribution center and office building, constructed with tilt-up panels and insulated metal panels, built for Chicken Express, in Burleson, Texas. The 30,000 SF cold storage area is comprised of a 17,400 SF freezer space, 4,500 SF cooler and a cold storage dock.

Amazon Westport Fulfillment Center

General Contractor: Hillwood Development Company

Size: 1.14 million ft2

Location: Haslet, TX

Build-to-suit fulfillment center for the world’s largest online retailer. The plumbing scope of this project will also include a 941,200 SF of mezzanine and over 7 miles of conveyors.

DFW Metro 1, 2 & 3

General Contractor: FA Peinado

Size: 347, 064 ft2

Location: DFW Airport

Design/Build 3 tilt wall constructed industrial warehouses located at DFW Airport.

Channell Corporation

General Contractor: Bob Moore Construction

Size: 175000 ft2

Location: Rockwall, TX

Design/Build of a corporate headquarters and manufacturing facility for Channell Commercial Corporation.

Solar Turbines

General Contractor: FA Peinado

Size: 120000 ft2

Location: DeSoto, TX

Plan/Spec of a motor assembly plant for parent company Caterpillar. One of thirteen worldwide facilities that focuses on repair and overhaul of gas turbine engines.

Dura Tech Manufacturing

General Contractor: Bob Moore Construction

Size: 57,000 ft2

Location: Mansfield, TX

Design/Build with tilt-up construction, this building provides 57,000 SF of custom-designed production space.

Carolina Beverage

General Contractor: Hillwood Construction Services

Size: 400,000 ft2

Location: Fort Worth, TX

This is a design/build 400,000 SF manufacturing and distribution center for Carolina Beverage Group LLC., a major beverage maker and packager for numerous national, as well as international, alcoholic and nonalcoholic beverages.

LG Electronics Manufacturing and Distribution

General Contractor: Hillwood Construction Services

Size: 1.1 million ft2

Location: Fort Worth, TX

A 1.1 million-square-foot design/build distribution center for the global electronics’ giant, which includes 40,000 square feet of office and shipping and receiving space. This project won 'Best Industrial Project' by D Magazine's CEO Commercial Real Estate Awards program.

Caterpillar Engine Assembly Plant

General Contractor: Burton Construction

Size: 840,000 ft2

Location: Seguin, TX

Design/Build project on Caterpillar's new engine assembly and manufacturing facility which includes 840,000 square foot concrete tilt wall with 40,000 square foot of office.

Triumph Aerostructures

General Contractor: KBR Building Group

Size: 257,000 ft2

Location: Red Oak, TX

Design/Build advanced manufacturing facility which included 240,000 SF of manufacturing space and 17,000 SF of office area. Hybrid compressed air delivery system for aerospace assembly.

NOV Hydra Rig

General Contractor: Bob Moore

Size: 106,000 ft2

Location: Fort Worth, TX

Design/Build assembly building with office space

Martin Brower

General Contractor: Hillwood

Size: 172,125 ft2

Location: Roanoke, TX

Design/Build office, blast freezers, freezer cooler, cool dock and dry storage for food processing company for one of the largest supplier worldwide of food distribution services for McDonalds.

GAF ISO Board Plant

General Contractor: Bob Moore

Size: 200,000 ft2

Location: Gainesville, TX

Design/Build on state-of-the art ISO manufacturing facility, with tank farm, for the largest roofing manufacturing company in North America.

Caterpillar Engine Head Machining Facility

General Contractor: FA Peinado

Size: 261, 000 ft2

Location: Schertz, TX

Design/Build on tilt wall industrial machining facility for makers of large industrial earth moving equipment.

BEF Foods Expansion

General Contractor: Gleeson Constructors

Size: 57,000 ft2

Location: Sulpher Springs, TX

Design/Build food processing facility which supplies the restaurant industry. Water supply and draining facilities for cook rooms.

Health Service North Texas – Denton

General Contractor: FPI Builders

Size: 6,000 ft2

Location: Denton, TX

Plan/Spec of outpatient medical clinic plumbing needs. Health Service North Texas provides medical treatment for a wide range of acute and chronic conditions.

Ikids

General Contractor: CenTex

Size: 4345 ft2

Location: Waxahachie, TX and Burleson, TX

Plan/Spec of two projects of pediatric dental and orthodontic center.

Key Whitman Eye Center

General Contractor: FA Peinado

Size: 35000 ft2

Location: Dallas, TX

Design/Build two story building for Dr. Whitman. Includes an eye clinic and ambulatory surgery center with state certified medical gas systems.

Wylie Medical Office Building

General Contractor: FA Peinado

Size: 50,000 ft2

Location: Wylie, TX

Design/Build for two-story tilt wall medical office building. Full emergency room wing, with complete life safety/support equipment, and medical gas systems installed by our state certified personnel.

One Bethany

General Contractor: Balfour Beatty

Size: 125,000 ft2

Location: Allen, TX

Design/Build of a five story class A office space. Within walking distance of Watters Creek and planned Allen Hotel.

Signet Jewelers

General Contractor: Roger's o'Brien

Size: 250,000 ft2

Location: Dallas, TX

Design/Build 4 story building for Signet Jewelers headquarters located lake-front in the Cypress Waters mixed use development.

Mercedes Financial

General Contractor: Hillwood Construction

Size: 200,000 ft2

Location: Fort Worth, TX

Build-to-Suit complete plumbing scope for office complex to serve as Mercedes-Benz Financial Services' national business operations center.

Granite Place Southlake

General Contractor: Ridgemont Construction

Size: 158,000 ft2

Location: Southlake, TX

Plumbing scope for a co-working and flexible office space located in Southlake Town Square. Providing access to numerous shops, restaurants and entertainment.

Allen Place

General Contractor: FA Peinado

Size: 223000 ft2

Location: Allen, TX

Design/Build encompassing four buildings, a three story office building, seven story test tower, service building and a parking garage for Sentinel Capital.

7-Eleven Corporation

General Contractor: Alston Construction

Size: 325000 ft2

Location: Irving, TX

Design/Build of a four story corporate office building and parking garage for 7-Eleven Corporation.

Coppell Commerce Center

General Contractor: Bob Moore Construction

Size: 771.720 ft2

Location: Coppell, TX

Design/build tilt-up construction industrial complex for warehouse and office buildings. These are two industrial facilities comprised of six, Class A buildings totaling 771,720 SF.

Conifer Headquarters and Service Center

General Contractor: Duke Realty

Size: 200,000 ft2 building and parking garage

Location: Frisco, TX

Build-to-suit, four story office building and 7 level parking garage for tenant involved in medical field.

First United Methodist Church Denton

General Contractor: FPI Builders

Size: 42000 ft2

Location: Denton, TX

Plan/Spec remodel of existing facility for First United Methodist Church Denton.

Woods Chapel Baptist Church

General Contractor: FPI Builders, Inc.

Size: 10,400 ft2

Location: Arlington, TX

This is a small plan/spec addition for the Children/Youth Education Building to the existing church. Classrooms and workrooms were added as well as toilet and laundry rooms for the Pre-K through 12th grade students and staff.

The Church on Rush Creek

General Contractor: The DeMoss Company

Size: 30,000 ft2

Location: Arlington, TX

Plan and spec project on a multi-purpose facility for worship, fellowship, and preschool and Phase IV, a building addition for preschool, youth, and adult educational space.

Parkwood 121 Village

General Contractor: FA Peinado

Size: 60,000 ft2

Location: Plano, TX

Design/Build mixed use encompassing 3 buildings with 20,000 sf of retail space and 40,000 sf of medical office space.

Adam Smith Texas Harley Davidson

General Contractor: Bob Moore Construction

Size: 71166 ft2

Location: Bedfor, TX

Design/Build of new retail, office and service department space for Adam Smith Texas Harley Davidson.

Arboretum Village

General Contractor: Bob Moore Construction

Size: 100,000 ft2

Location: Dallas, TX

The plan/spec 100,000 SF development will bring new retail stores and restaurants to the 11 acre redevelopment including a Fresh Market, Ace Hardware, Luke’s Locker, Pet Smart and Starbuck’s to name a few.

Tandy Leather

General Contractor: Bob Moore

Size: 21,000 ft2

Location: Fort Worth, TX

Design/Build prototype retail concept facility. The plumbing scope of this project also includes 3,000 SF of mezzanine space which holds a classroom, employee break room and business offices.

“Howard Kane Plumbing has consistently provided the best service, price and quality for F.A. Peinado and our projects. Whenever we have had a high profile project, we are more than pleased to have Howard Kane as one of our team members. To date, Howard Kane has performed on several million SF of construction for F.A. Peinado and will be involved on many more projects in the future.” - Frank A. “Teddy” Peinado, President, F.A. Peinado

Services

At Howard Kane Plumbing Company, our philosophy exemplifies our attitude towards service and quality control. From inception to completion of a project, every aspect of the client’s operation and needs are fully researched, analyzed and critiqued for functionality, utilization and, cost-effectiveness to ensure the most optimum outcome. We make it our goal to generate logical & creative solutions to meet each owner’s project needs, including the realities of cost & time.

Design/Build

Howard Kane Plumbing Company is a plumbing contracting firm specializing in delivering complete design / build services covering a broad spectrum of project types, sizes, budgets, schedules, and locations. Our goal and reputation is based upon a quality project that performs. In this industry, our next project comes from referrals from satisfied customers. Therefore, Howard Kane Plumbing sets quality and performance above all else. Our design team will take your preliminary concept and develop it into a fully engineered and built project on time, within budget, and to highest quality standards. We consider ourselves your partner in the construction process – from initial design to final completion.

Plan & Specification

If you already have plans and are ready to implement your project, we are a perfect partner for scoping, pricing, and delivering the project. We have an excellent track record for being price competitive while ensuring the quality you expect to meet your business needs. Our plan/spec team will look carefully at both your cost and performance needs. We will work closely with you to recommend a system that will meet your specific needs and provide detailed step-by-step project management procedures that will ensure installation and commissioning will take place in a timely, cost-effective manner.

Conceptual Budgeting

Accuracy informed by expertise. One of the advantages of being in business for over 50 years is experience. Through this experience Howard Kane Plumbing Company has accumulated a vast amount of historical data. Our experience, combined with accurate information and construction knowledge results in accurate budgeting. Howard Kane is known throughout the industry as a reliable, accurate source for conceptual budgeting and with our considerable experience over all kinds of product type our numbers can be trusted.

LEED Design

Building with our community’s sustainable future in mind, we offer LEED assistance and participation for our clients and their projects. Let Howard Kane Plumbing Company guide and manage the LEED certification process to a successful project completion. We will integrate the LEED requirements into the pre-construction phase of the project to assure that the project meets the required points to meet the agreed upon certification level at completion.

Med Gas Piping

A hospital’s medical gas system can literally be a patient’s lifeline, bringing medical (breathing) air, nitrous oxide for anesthesia, and pure oxygen. Also, piped through a hospital is nitrogen to operate surgical power tools. These systems are not used in just operating rooms and hospitals. They are also found in doctors’ offices, dentists’ offices, outpatient clinics and nursing homes. It is the responsibility of certified medical gas-plumbing contractors to take all steps necessary to ensure patient safety. At Howard Kane Plumbing Company, our Medical Gas installers are fully licensed and experienced to successfully execute services on most Gas and Vacuum systems in the Healthcare industry.

Process Piping

Howard Kane Plumbing Company also specializes in the installation of Process and Utility Piping and conveyor systems for commercial and industrial applications. Used in conjunction with a variety of valves and fittings that control the pressure and flow of the transmitted material, process piping can be simple, light duty systems requiring little additional work, or more complex, heavy-duty systems that require expert welding, lathe, and milling techniques to ensure efficiency of operation.

Value Engineering

Value Engineering has long been defined by the cognizant and precise set of disciplined procedures designed to seek out optimum value for investments. At Howard Kane Plumbing Company, our primary objectives are to improve quality, minimize total ownership costs, reduce construction time, simplify the construction process, insure safety, and meet projected performance goals. Our extensive experience with a wide variety of building types and materials enables us to bring forth new and innovative ideas that have a direct impact on the performance and cost of the building without compromising the functional and value objectives of the client.

 

“We continue to contract with Howard Kane Plumbing because of their expertise in preconstruction/design combined with their experienced field personnel. The high caliber of employees all have a strong commitment to the projects and everyone helps “make it happen” which is one of the keys to success in our business.” - Craig A. Morris, Vice President, Cadence McShane Construction

Careers

The impressive growth of our company, sales and working conditions at Howard Kane Plumbing Company are directly related to the outstanding skills and team work of all of our employees.

Our present position in the Dallas/Fort Worth areas makes us all proud for what we’ve accomplished. Perhaps more important is the confidence our satisfied customers give to us. It is up to each of us to maintain customer confidence in our integrity, productivity and technical knowledge, which is why we continually seek talented and motivated individuals to join our company.

In setting added growth as a goal, this company recognizes that incentive and a positive working environment are important to its employees. We are committed to providing the fairest possible compensation and benefit program and to giving personnel policies the most careful consideration. We offer an equal opportunity environment and encourage continual training and self-development.

All applicants offered an employment opportunity with Howard Kane Plumbing Co., will be required to pass an alcohol, drug and physical exam as a condition of employment.

Benefits available are as follows: 100% employer paid health, dental, vision and life insurance benefits to all employees, 401(k) profit sharing plan including 4% employer match, paid time off, paid holidays, additional benefits through a cafeteria plan which offers income protection (i.e., short-term and long-term disability, accident, cancer), direct deposit, and paid training programs.

Interested in a career at Howard Kane?

Please click here to view open positions and complete an application to be considered for employment. Come join the Howard Kane Plumbing team today!
Fax: 817-222-9833

Our commitment to constructing continuing partnerships from client relationships, is the trademark of the Howard Kane Plumbing way. Our enduring relationships with our clients happen because we deliver considerable value, with our quality, our integrity, and the experience in our proven processes throughout every phase of construction.

Contact

Howard Kane Plumbing Company, Inc.
5928 Posey Lane
Haltom City, Texas 76117

Thank you! We have received your message.

name

email

message

Back to Top